Assembly
In order to ensure the assembly time on site is as short as possible, our retaining system is set up using the modular principle. The components are pre-assembled in the production hall so as to allow rapid installation on site. As a result, the time needed for assembling a rubber dam is much shorter.
The procedure of mounting the retaining system and rubber sheet is standardized to the point that it can be done by the contractor’s staff under the guidance and upon training through one of our supervisors. To ensure the functioning of the rubber dam, a detailed quality system was developed for installing the retaining system. Of course, the installation can also be done by our qualified personnel.
The regulation system is generally installed by our own teams. This does not only include the mechanical but also the electrical installation of the control system. The installation work is completed with the commissioning of the rubber dam.